Back to Calculator

Migrating CI/CD Platforms

A cost and effort guide for the most common CI/CD platform migrations. Updated March 2026.

Why Teams Migrate CI/CD Platforms

Cost
Unexpected bills scaling faster than headcount
Consolidation
Reducing the number of vendor relationships
Performance
Build times too slow on current platform
Ecosystem
Moving to GitHub/GitLab for source control
JenkinstoGitHub ActionsHigh Effort
Timeline
4-12 weeks
Cost Impact
Variable (depends on minutes)

Key Challenges

  • Groovy Jenkinsfiles must be rewritten in YAML
  • Shared libraries need to become reusable workflows or actions
  • Plugin functionality must be replicated with marketplace actions
  • Complex conditional logic and multi-branch pipelines require redesign

Migration Tips

  • Start with simple pipelines (lint, unit test) and build confidence
  • Use GitHub Actions Importer tool for automated conversion drafts
  • Document all plugin dependencies before starting
  • Plan for parallel running period of 2-4 weeks
CircleCItoGitHub ActionsMedium Effort
Timeline
1-3 weeks
Cost Impact
Often comparable or cheaper

Key Challenges

  • CircleCI Orbs map to GitHub Actions reusable workflows
  • CircleCI resource classes map to GitHub-hosted runner types
  • CircleCI contexts map to GitHub encrypted secrets and environments
  • Workflow syntax differences require manual translation

Migration Tips

  • Use GitHub Actions Importer to generate first-pass YAML
  • Map your CircleCI resource class usage to GitHub runner types
  • Test with less critical branches first
  • Verify cache key format compatibility
Bitbucket PipelinestoGitHub ActionsMedium Effort
Timeline
2-4 weeks
Cost Impact
Usually higher unless on GitHub already

Key Challenges

  • Repository migration from Bitbucket to GitHub is the main blocker
  • Bitbucket Pipes map to GitHub Actions marketplace actions
  • Deployment environments need to be recreated
  • Jira integration requires GitHub connector setup

Migration Tips

  • Migrate repositories first, then pipelines
  • Check if Jira integration is critical before committing
  • Evaluate if staying on Atlassian stack (GitLab is not an option here) fits better
  • Consider cost impact of Bitbucket seat savings vs GitHub seats
GitLab CItoGitHub ActionsHigh Effort
Timeline
6-16 weeks
Cost Impact
Usually higher (GitLab includes more free minutes)

Key Challenges

  • Significant cost increase likely without careful optimisation
  • GitLab CI pipeline hierarchy differs substantially from Actions
  • GitLab Container Registry migration is a separate workstream
  • Loss of GitLab DevOps features (Issues, MRs, security scanning) if not using both

Migration Tips

  • Carefully model costs before committing - GitLab often wins on price
  • Consider keeping GitLab for its DevOps features and syncing to GitHub
  • If migrating for consolidation, evaluate GitHub Enterprise total cost
  • Use GitLab CI/CD Catalog as migration reference for action equivalents

Universal Migration Checklist

Audit all existing pipelines and document their purpose
Identify all secrets, credentials, and environment variables
Map all external integrations (Slack, PagerDuty, deployment targets)
Calculate expected cost on new platform before migrating
Run both platforms in parallel for at least 2 weeks
Migrate non-critical pipelines first to build confidence
Document all custom scripts and their dependencies
Plan a rollback strategy before cutting over